10 Madaffari Drive
Clean and ready for Handover!
So close to pratical completion
How amazing does this ceiling look!
Roof Cover complete and solar panels installed :)
What a view!!
Upper Flooring being installed.
All the lower level frames, columns and beams are tied down, braced and screwed.
Steel columns in place ready to receive the wall framing
Fire walls clad in readiness for painting before we stand them up on the boundary.
Slab set and ready for work
Thanks to Aaron from Northwest Concreting for a nice flat level slab as our basis for the works to follow
Plumbing & Electrical Prelays complete
Earthworks have begun on our new build
Pool Hole is dug and Pool installed.