10 Madaffari Drive

Clean and ready for Handover!

So close to pratical completion

How amazing does this ceiling look!

Roof Cover complete and solar panels installed :)

What a view!!

Upper Flooring being installed.

All the lower level frames, columns and beams are tied down, braced and screwed.

Steel columns in place ready to receive the wall framing

Fire walls clad in readiness for painting before we stand them up on the boundary.

Slab set and ready for work

Thanks to Aaron from Northwest Concreting for a nice flat level slab as our basis for the works to follow

Plumbing & Electrical Prelays complete

Earthworks have begun on our new build

Pool Hole is dug and Pool installed.

Website by Sherpa Design